Request Callback

Projects

Anteon House, Peterborough

Posted at 12:43 on Thursday 17th October 2013

We were appointed to supply and install this 8 bay portal frame structure. The frame was a total of 45 tonnes including cold rolled steels. Location – Peterborough

Sutton Coldfield Grammar School

Posted at 12:43 on Thursday 17th October 2013

We were appointed to supply and install this 6 bay flat top portal frame structure. The frame was a total of 30 Tonnes of hot & cold rolled steels. Location – Sutton Coldfield

Otley College, Ipswich

Posted at 12:39 on Thursday 17th October 2013

We were appointed to supply and install this 5 bay portal frame structure including a complex horizontal and vertical cladding rail system. The frame was a total of 38 Tonnes including cold rolled steels. It was completed under very tight programme. Location – Ipswich.